Monday 18 April 2011

NWCF - Those little things perhaps you did not notice on the day!


 It was perhaps easy to notice the major works undertaken during our NatWest CricketForce@Sawley & Long Eaton Park CC - but what about those those little jobs which have been annoying some members for ages. Well have a look at this list.

*Social area of main pavilion insulated and loft boards fitted for much needed storage.
[insulation acquired for social area of GD – but still to be fitted]
*Coping stones on brick veranda cemented back in place at main pavilion.
Beautifully tiled in grey slate - Dean is delighted
*Cellar area and kitchen in main pavilion slate tiled.
*paving slab step secured at back entrance to main pavilion.
*Downpipes replaced and aluminium protectors fitted at main pavilion 
*Roof of main pavilion cleaned especially the drainage valleys.
*additional clothes peg in main pavilion umpires room
*sight screen at main pavilion repaired.
Now the 3rd XI can have their sight screen back
*oven in main pavilion and ladies toilets thoroughly cleaned.
*old dart board and chalk board removed from GD pavilion.
*new concrete floor in toilet of home changing room in main pavilion.
*multiple water leaks in GD pavilion sorted.

Attention to detail - even an extra clothes peg in the main pavilion umpoires room.